As the Christmas Holiday approaches the exciting progress on our beautiful building makes a bolder statement on the neighborhood. This is a view from the southwest corner of Fairview Avenue and Denny Way looking northeast. This is the signature view of the building as we are looking at the Gateway Corner for the South Lake Union Neighborhood. This is known as Zone 4. The form work tables have been moved up above level-12 to form the roof of the structure in Zone 4! The exterior framing is progressing through level-10, with window preparation beginning on level-9 of this zone. The masonry veneer is progressing to level-8 for the Fairview Avenue side of the zone. Interior finishes are underway on level-2-4 for all zones, with Drywall on level-5.
|
Here is a view looking west to northwest down Denny Way toward Mirabella, with the Space Needle in the background behind Zone 4 on the left. The completed framing and sheathing for level-9 is visible. The windows are completed for level-8 for these sides. The form work tables for level-12 are in place for zones 3, 2, and 1; with level-13 in zone 4. The installation of the exterior water and vapor barrier, “Blueskin”, is continuing on the exterior sheathing to allow the veneer to be applied along with drying-in the building.
|