Here is a view looking west to northwest down Denny Way toward Mirabella, with the Space Needle in the background behind Zone 4 on the left. The completed framing and sheathing for level-8 is visible, with the windows completed for level-6 into Zone 2. The form work tables for level-11 are in place for Zones 4 and 3. The installation of the exterior water and vapor barrier, “Blueskin”, is continuing on the exterior sheathing to allow the veneer to be applied along with drying-in the building.
|