| Construction is Under Way!
November 2, 2007
|
Another wonderful fall day in Seattle! This is a view from the SW corner of Fairview Avenue and Denny Way looking northeast. This is the signature view of the building as we are looking at the Gateway Corner for the South Lake Union Neighborhood. This is known as Zone 4. The level-10 deck formwork tables have been moved into place for Zone 4 and 3. The exterior framing is complete through level-7, with the windows installed for level-5. The masonry veneer is completed up through level-5 for the Denny Way sides of the zones. Interior finishes are underway on level-2 of zones 4 and 3, and sheetrock taping and finishing is ongoing on level-3.
|
|
Here is a view looking west to northwest down Denny Way toward Mirabella, with the Space Needle in the background behind Zone 4 on the left. The completed framing and sheathing for level-7 is visible, with the windows completed for level-5. The form work tables for level-10 are in place in Zone 3 with Zone 2 scheduled for next week. The installation of the exterior water and vapor barrier, “Blueskin”, is continuing on the exterior sheathing to allow the veneer to be applied.
|
|
This is a view from Unit 916 looking southwest across the courtyard at Zone 4 with Fairview Avenue on the right side of the photograph. This give you a good view of the brick veneer as well as the forms in place for level-10.
|
|
This is a view from the corner of John Street and Minor Ave. looking South to Southwest at Zone 2 of the building. The deck, core, and columns are complete for level-9 with the form work tables being readied for the move to level-10. The exterior framing continues on level-7.
|
Back
|
 |