For Seattle Seniors
  Mirabella Retirement Community Stylish senior living. Lifetime service. Continuing Care Retirement Community
Mirabella Retirement Community Lifestyle Health Care About Us Contact Us!
Contact Us!    
   
Construction is Under Way!

October 19, 2007

Mirabella Construction

The progress continues despite the wind and rain! This is a view from the SW corner of Fairview Avenue and Denny Way looking northeast. This is the signature view of the building as we are looking at the Gateway Corner for the South Lake Union Neighborhood. This is known as Zone 4. The level-9 deck has been poured for Zone 4 and formwork is in place for Zones 3 and 2. The exterior framing is about 50% complete for level-6, with windows being installed in level-5. The masonry veneer is completed up to the midpoint of level-4 for both the Fairview Ave. and Denny Way sides of the zones. Interior painting has begun on level-2 of this zone.

 

Mirabella Construction

Here is a view looking west to northwest down Denny Way toward Mirabella, with the Space Needle in the background behind Zone 4 on the left. The completed framing and sheathing of level-6 is visible, with the windows starting to be installed on level-5. The decks form work is in place for level-9 for Zones 3 and 2. The installation of the exterior water and vapor barrier, “Blueskin”, is continuing to allow the installation of the insulation and brick veneer to proceed.

 

Mirabella Construction

This is a view from Unit 610 looking southwest across the courtyard toward Zone 4. The progression of the exterior framing through level-6 is evident inside the courtyard as well as outside. The masonry veneer continues around the inside of the courtyard.

 

Mirabella Construction

This is a view from across Fairview Avenue looking south to southeast with Zone 1 in the foreground and Zone 4 in the background. Centered in the photograph is where the driveway entrance will be from Fairview, with the exit coming out of the building to the right of the circular window.

 

Mirabella Construction

This is a view from the corner of John Street and Minor Ave. looking South to Southwest at Zone 2 of the building. The structural forms are installed for the level-9 deck. The exterior framing has moved up to level-6. The “Blueskin” vapor and water barrier is being applied to begin the masonry veneer process.

Back

Mirabella • 116 Fairview Ave. North • Seattle, WA 98109 • (206) 447-5658
Seattle Welcome | Lifestyle | Community | Health Care | About Us | Contact Us | Careers
Website Index
| Mirabella Communities

Copyright © 2006-2009 Pacific Retirement Services, Inc. All rights reserved.
Read our privacy guidelines. Reproduction in whole or in part in any form or medium
without express written permission is prohibited.
Site by prsMedia

Pacific Retirement Services Equal Housing Opportunity