|
Here is a view from the north tower crane looking S to SW at Zones 3 and 4. Denny Way is the street visible at the top of the photograph with Fairview Ave. N. on the right of the photograph. The core elevator tower for Zone 4 is visible on the right. The concrete deck for level-3 has been poured in Zone 4 and the form work is installed for Zone 3 level-3. The structural steel and embeds are being installed on this level in Zone 3 for preparation for a pour next week. The structural steel for the columns is in place in Zone 4. The exterior walls with the yellow sheathing are visible on level-1 of Zones 4 and 3, as the framing continues into Zone 2 on level-1. The large brown panels visible in the courtyard are form tables that will be used to form floors 4 and higher. These are large forms that fit between and support off of the columns and will speed up the concrete pouring process. The largest form is 27’ X 90’. In the lower part of the photograph the Zone 1 level-2 deck is visible.
|
|
This is a view from the north tower crane looking S to SE at Zones 3 and 2, with 4 on the right hand top side of the photograph. Denny Way is the street visible at the top of the photograph with Minor Ave. on the left of the photograph. The core elevator tower for Zone 3- level-2 is visible in the upper center of the photograph. The form work is being installed for level-3 of Zone 2. Zone 3 has the structural steel and embed placement in process.
|
|
This is a view from the north tower crane looking East at Zone 2. Minor Avenue is the street visible at the top of the photograph with John Street on the left of the photograph. The core elevator tower is visible in the center of the photograph. The form work for the level-3 deck is being installed with the level-2 deck visible below.
|
|
This is a view from the north tower crane looking West at Zone 1. Fairview Avenue North is the street barely visible at the top of the photograph with John Street on the right of the photograph. We are looking at the level-2 deck for this zone with the integral canopies that overhang the sidewalk on John Street visible on the right side of the photograph. As you can see the columns are poured out for this level along with the elevator core in preparation for forming level-3. |