Here is the site aerial photograph taken on 6/19/07. This gives you a great view of the whole project with Fairview Avenue at the base of the photograph and Denny Way on the right side of the photograph. East is at the top of the photograph. Zone 4 is the lower right working counter clockwise sequentially through the Zones to end up in Zone 1 on the lower left of the photograph. From this view the Zones as defined by the deck pours are readily apparent. Zone 4 shows the form work being installed on level-3. Zone 1 shows the structural steel and cables installed getting ready for the concrete pour. Zones 2 and 3 are poured out on level-2. This also gives a good perspective of the courtyards, both the entry and the upper private courtyard.
|
|
Here is a view from the future exercise studio of level-1 looking west out across the courtyard and the driveway entrance off of Fairview Avenue. The level -2 and level-3 decks for Zone 4 is directly visible to the left of the Space Needle. The level-2 deck in Zone 1 is visible on the right side of the photograph. The large steel beam structure in the middle of the courtyard and also stacked on the left side, are the large “flying forms” that will be used for floors four and above. These large platforms cut down on the amount of time necessary to form the levels. The larges one is 27 feet wide by 90 feet long.
|
|
This is a view looking across Fairview Avenue to the SE, looking at the entrance courtyard to the building. Turner has installed a temporary driveway access in a similar location to the main entrance to the courtyard. Zone 4 is visible on the right side of the photograph with the framing installed on level-1, and the form work installed and being readied to pour level-3.
|
|
This is a view looking north across Denny Way down Minor Street. Zone 3 is visible in the forefront of the building. The level-2 deck is visible along with the poured columns for level-2. The form work is underway for level-3 in Zone 3. |