Here is a view from the north tower crane looking S to SW at Zones 3 and 4. Denny Way is the street visible at the top of the photograph with Fairview Ave. N. on the right of the photograph. The core elevator tower for Zone 4 is visible on the right with the level-2 lift having been poured this week. The level-2 deck pour is complete for both Zones 4 and 3. The upper courtyard area to the immediate left of the entrance courtyard is Zone 6, which is having the structural steel and cables along with all mechanical and electrical rough-ins installed in preparation for next weeks pour. This is the private elevated courtyard for the building and will be covered with plantings, pavers, and water features.
|