Here is a view from the north tower crane looking S to SW at Zones 3 and 4. Denny Way is the street visible at the top of the photograph with Fairview Ave. N. on the right of the photograph. The core elevator towers for Zone 4 is visible on the right. The form work is installed for the level-2 deck in Zone 4 and into Zone 3. The structural steel and steel cables are being installed on this level in preparation for a pour next week. In the lower part of the photograph the Zone 1 deck that ties into the courtyard is visible and as you can see it was poured today. The first bay between columns of this new concrete area is the covered drive through area of the courtyard and main entry to the building. The remaining courtyard area to the immediate left of the entrance courtyard is Zone 6, which will be poured after Zones 1.
|
|
This is a view from the north tower crane looking S to SE at Zones 3 and 4. Denny Way is the street visible at the top of the photograph with Minor Ave. on the left of the photograph. The core elevator tower for Zone 3- level-2 is visible in the upper center of the photograph. The form work is being installed for level-2 of Zone 3, with Zone 4 level-2 deck with the cables installed visible in the upper right of the photograph. Most of the columns for the level-2 deck have been poured in Zone 2. The courtyard form work for Zone 6 is visible on the right side of the photograph.
|
|
This is a view from the north tower crane looking East at Zone 2. Minor Avenue is the street visible at the top of the photograph with John Street on the left of the photograph. The core elevator tower is visible in the center of the photograph and this level was poured this week. Work has begun on pouring the next level of columns throughout Zone 2 in preparation for the level-2 deck. The visible yellow items are tarps that are protecting the newly pour concrete canopies that will provide protection along the sidewalk area of the building.
|
|
| This is a view from the north tower crane looking West at Zone 1. Fairview Avenue North is the street barely visible at the top of the photograph with John Street on the right of the photograph. The form work is complete for the level-1 deck. This Zone has two major levels and due to construction logistics the lower level of this deck was poured first, and was just poured today. The visible section of deck that was just poured is also part of the entry courtyard off of Fairview Ave. N. As stated earlier, the area between the two far left columns is the covered drop off area for the main building entry. The structural steel reinforcement has begun along the second half of the level-1 Zone 1 deck. |