|
Here is a view from the north tower crane looking S to SW at Zones 3 and 4. Denny Way is the street visible at the top of the photograph with Fairview Ave. N. on the right of the photograph. The core elevator towers for both zones are visible with 3 on the left and 4 on the right. The inner form work for both of the elevator cores is in place inside the core as they prepare for the next additional lift. In the lower part of the photograph the concrete deck for the entrance courtyard is completed and being utilized as a staging area, this area is known as Zone 5. The remaining courtyard area to the immediate left of the entrance courtyard is Zone 6, which will be poured after Zones 2 and 1.The form work continues into Zone 1 in the lower right of the courtyard around the visible two story columns as the level 1 deck is connected.
|
|
This is a view from the north tower crane looking S to SE at Zones 3 and 4. Denny Way is the street visible at the top of the photograph with Minor Ave. on the left of the photograph. Minor Avenue has been re-opened to the public for a few weeks. The core elevator tower for Zone 3- level 1 is visible in the upper center of the photograph, and the inner form work is visible for the next lift level. The form work for the Zone 2 first level deck is installed and work is progressing on the structural steel reinforcement for the entire Zone 2 level 1 deck. On the left middle of the photograph the bottom structural deck for the pools and spa area has been poured today. The structural steel vertical bars that stub out of the lower deck show the outline of the walls that will be forming the two pools and one circular spa. The courtyard form work for Zone 6 is visible on the right side of the photograph.
|
|
This is a view from the north tower crane looking East at Zone 2. Minor Avenue is the street visible at the top of the photograph with John Street on the left of the photograph. The core elevator tower is visible in the center of the photograph. The form work is complete for Zone 2 level 1 deck and work progresses on the installation of all of the embeds and structural steel reinforcement for this deck. The visible blue items are the structural steel tensioning cables that form the major structural element of the concrete deck. They are scheduled to pour this deck next week.
|
|
| This is a view from the north tower crane looking West at Zone 1. Fairview Avenue North is the street barely visible at the top of the photograph with John Street on the right of the photograph. They are working on completing the form work throughout this zone as the level 1 deck is tied into Zones 5 and 2, completing the perimeter of the building. Visible on the right of the form work is the work progressing on the detailed steps and transitions to the level 1 deck and exterior wall around John Street and Fairview Avenue. |