View from Denny Way looking NW to Fairview at Zone 4. This shows the progress on the elevator core, columns, and exterior walls in this zone. The exterior walls have been formed with Shotcrete and are complete up to the first floor except for the exterior pilasters which will be poured after the slab on grade is poured. The capillary break (compacted gravel/rock used for drainage) is installed and ready for the slab on grade to be poured for this section. This will be the finished floor of this portion of the garage floor.
|
|
This is a view from the corner of Denny Way and Minor Ave. looking NW across the site with Zone 3 in the forefront. This is a view of the Zone 3 elevator core which was poured up to the first lift level last week. The contractor is continuing to work on the columns in this area while the Mechanical contractor is completing the under-slab plumbing and mechanical in this Zone. The steel reinforcement for the Zone 2 elevator core mat footing is visible in the upper right corner.
|
|
View from Minor Avenue looking west across Zone 2 with John Street on your right. This area has extensive large footings, vaults, and detention tanks that require large amounts of steel reinforcement work. This view shows the main detention vault closest to Minor Ave. with the mat footing on the left and the large wall footing on the right. These footings are between five and six feet deep. The second tower crane is visible in the upper portion of the picture and is located between Zones 2 and 1. The large mobile crane that is erecting the second tower crane is visible on the right.
|
|
| View looking NW from two blocks away near the Marketing Office. This shows the second tower crane being erected with the large mobile crane. With Mirabella taking up a complete block along with the shape of the building following the perimeter of the block, two tower cranes are needed to complete the work and to reach all areas required. |