Construction is Nearing Completion!
May 28, 2010

This view of Mirabella is from the southwest taken from the corner of SW Moody and SW Gaines looking northeast, from the 22nd floor of the Riva building.

This is a close up view of the south façade of the upper floors of Mirabella.

This view is looking southeast towards Mirabella as the final stages of the exterior work elevators, also known as the “man-lift” are being removed. This photo was taken from the 15th floor observation deck of the OHSU Center for Health and Healing.

This photo shows a row of the car lifts as there are being installed at the garage level. This view is of the row of lifts that run along the west end of the garage.

This view is of the recently placed resident storage lockers located on the storage level.

This view is of the reception area at the level-1 entry to Mirabella as the reception desk has just been assembled.

This is the Tower elevator lobby at level-1 as the finish work nears completion. This elevator lobby is located directly behind the reception desk.

This view is of the sitting area and fireplace located at the south end of the library, located on level-1

The above photo is of the level-1 classroom / auditorium, looking south east.

This view is of the level-1 private dining room, looking east.

This view is of the pool area, looking west as work continues on the finish surfaces of the pool.

This is a view of an apartment-home located at the northeast corner of level-15.

This is a view of an apartment-home located at the northeast corner of level-15.